Mapped (unverified)
ekom21
Gießen, Hessen, Germany
Source: OpenStreetMap
ekom21 is a mapped data center in Hessen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Wäre linkes Bündnis im Katzenfeld geplatzt? Linke kritisiert geplantes Rechenzentrum in GießenGießener Allgemeine· Jun 11, 2026
- Flughafen Frankfurt: Terminal 2 bleibt jahrelang geschlossenFAZ· Jun 9, 2026
- Gießen: Mehrere Interessenten für Fläche für RechenzentrumFAZ· Jun 9, 2026
- Rechenzentrum in Gießen verzögert sich um ein Jahr – Baukosten über einer MilliardeGießener Allgemeine· Jun 6, 2026
- Stadtwerke Gießen warnen: Stromverbrauch und Preise steigen weiterGiessener Anzeiger· Jun 5, 2026
- Rechenzentrum rückt näher: Magistrat ändert FlächennutzungsplanGiessener Anzeiger· Jun 2, 2026