Mapped (unverified)
Destination Earth Data Bridge
Hessen, Germany
Source: OpenStreetMap
Destination Earth Data Bridge is a mapped data center in Hessen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Saline data center brings out bigwigs. Big day for Michigan or big betrayal?Bridge Michigan· Jun 1, 2026
- The Genesis Mission Needs Hydrology: Here’s How to Incorporate Iteos.org· Apr 28, 2026
- The World's Largest Planned Data Center Is Running Into TroubleDistilled | Michael Thomas· Apr 19, 2026
- Amazon lines up 1 million-square-foot suburban warehouse deal with logistics firmCrain's Chicago Business· Mar 6, 2026
- Is the future of compute space-based?Techzine Global· Jan 26, 2026
- Report: States like Michigan ‘simply not prepared’ for data center water demandBridge Michigan· Aug 20, 2025