Dell 350 Holger Way
400 Holger Way · San Jose, Santa Clara County, CA
Source: OpenStreetMap
Dell 350 Holger Way is a mapped data center in Santa Clara County, CA. DataCentersExposed has documented a 45,282 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Take action
Santa Clara, California
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
The next decision point
Packing the room is the single most effective thing you can do. One meeting can stop a project.
- DecisionCity Councilin 7 days
Tue, Oct 20, 2026 · 1:30 PM PDT
City Council: ER25-243 - Administrative Hearing on the Appeal of the In-fill Exemption for a Data Center Use at 300 Holger Way.
Hearing timeline
- DecisionCity Councilin 7 days
Tue, Oct 20, 2026 · 1:30 PM PDT
City Council: ER25-243 - Administrative Hearing on the Appeal of the In-fill Exemption for a Data Center Use at 300 Holger Way.
- City Council and Authorities Concurrent
Tue, Oct 6, 2026 · 5:30 PM PDT
City Council and Authorities Concurrent: data-center item — Staff Presentation and Solicitation of Input on a Comprehensive Approach to Updating City Policies Addressing New Data Center Development [Staff’s Response to Councilmember Jain’s 030 Request, Approved by Council, Regarding New Policy Devel
Meeting detailsvia Legistar · medium confidence - City Council and Authorities Concurrent
Tue, Aug 18, 2026 · 5:30 PM PDT
City Council and Authorities Concurrent: data-center item — Action on a Council Written Request (Council Policy 030) Submitted by Councilmember Jain to Place an Item on a Future Council Agenda Regarding a Policy Limiting the Type and Quantity of Water Used by Data Centers
Meeting detailsvia Legistar · medium confidence
Never miss a meeting: subscribe in your calendar · download .ics
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkdata center
The grid behind this site, right now
source: CAISO · gridstatus- Solar59.3%
- Natural Gas24.3%
- Nuclear5.7%
- Wind4.3%
- Hydro3.2%
- Imports3.0%
- Geothermal2.0%
- Biomass1.1%
Real-time generation mix for the CAISO grid this site draws from, as of Aug 17, 2026, 8:05 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- San Jose leaders discuss standards for data centersNBC Bay Area· Oct 13, 2026
- Taiwan manufacturers to showcase AI data center hardware at OCP summit in San Josedigitimes· Oct 12, 2026
- Santa Clara wants better water, air standards for data centersSan José Spotlight· Oct 11, 2026
- NEWS RELEASE: City of San José Shares Most Comprehensive Set of Standards for Data Centers and Large Energy Projects – Community MeetingCity of San Jose (.gov)· Oct 9, 2026
- As concerns about data centers grow, San Jose reveals how it plans to regulate themThe Mercury News· Oct 9, 2026
- Oakland passes 45-day data center moratoriumCBS News· Oct 7, 2026
In public meetings
Where this facility is discussed in the verbatim record of public government meetings. Captions are auto-generated and uncorrected.
- City CouncilOct 20, 2026
“…6. (Planning, Building, and Code Enforcement) 71. [26-1082] ER25-243 - Administrative Hearing on the Appeal of the In-fill Exemption for a Data Center Use at 300 Holger Way. (a) Conduct a public hearing to consider the environmental appeal of the Planning Director’s reliance on an In-fill Exemption in accordance wi…”
Read the transcript · 4 mentions
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (San Jose), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Kathleen Macdonald High in San Jose, is 0.9 mi from this site (209 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.