CyrusOne FRA2
Frankfurt am Main, Hessen, Germany
Source: OpenStreetMap
CyrusOne FRA2 is a mapped data center in Hessen, Germany, operated by CyrusOne LLC. DataCentersExposed has documented a 44,090 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCyrusOne FRA2 is a mapped data center in Frankfurt am Main, Germany, operated by CyrusOne LLC. Its reported footprint is 44,090 square feet. The corporate ownership above CyrusOne LLC is not disclosed in available records.
Operator chain
- Ultimate parentCyrusOne LLC
- Files asCyrusOne LLC
- This facilityCyrusOne FRA2
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Rechenzentrenausbau auf Kosten der Stromkunden? Das Energieproblem hinter dem KI-HypeAlgorithmWatch· Nov 25, 2025
- Kooperation: Eon und Cyrus One gehen gegen Kapazitätsengpässe vorZFK – Zeitung für kommunale Wirtschaft· Jun 2, 2025
- Cyrusone baut FRA7 - mit AbwärmenutzungDataCenter-Insider· Jul 22, 2024
- Eine Milliarde ins neue Rechenzentrum investiertfnp.de· Jul 21, 2024
- Erster Spatenstich für Rechenzentrum Cyrus One FRA7 in Frankfurtimmobilienmanager· Jul 19, 2024
- Cyrus One baut Mega-Rechenzentrum in Frankfurt-GriesheimHit Radio FFH· Jul 18, 2024