CoreSite Real Estate SV9, L.P.
Santa Clara County, CA
Source: Primary source
CoreSite Real Estate SV9, L.P. is an operating data center in Santa Clara County, CA, operated by CoreSite, LLC and ultimately owned by American Tower Corporation. DataCentersExposed has documented 49 MW of reported power capacity and a 60,403 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jul 15, 2026
Overview
source: linkEIA Plant 69363 (CoreSite Real Estate SV9, L.P.). Generation tech: Petroleum Liquids. Reported capacity: 49.0 MW
Operator chain
- Ultimate parentAmerican Tower Corporation
- Files asCoreSite, LLC
- This facilityCoreSite Real Estate SV9, L.P.
The grid behind this site, right now
source: CAISO · gridstatus- Solar54.2%
- Natural Gas26.4%
- Hydro5.7%
- Nuclear5.6%
- Wind5.3%
- Geothermal1.9%
- Biomass0.9%
Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 8:25 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Harbor Link Expands Underground Fiber Network into CoreSite DC2 Data CenterThe Fast Mode· Jul 15, 2026
- Harbor Link Deploys Underground Fiber into CoreSite DC2 Data Center, Expanding Carrier Diversity in Washington, D.C. and Northern VirginiaBusiness Wire· Jul 14, 2026
- Could a new Denver data center use up to 800,000 gallons of water a day?The Colorado Sun· Jun 29, 2026
- Jane Fonda visits Denver to highlight a battle against a local data centerDenverite· Jun 25, 2026
- Actress Jane Fonda boosts Elyria-Swansea's fight over data centerAxios· Jun 25, 2026
- Appeals Court Partly Sides With Fairfax County In Data Center Tax Records DisputePatch· Jun 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Bracher Elementary in Santa Clara, is 0.7 mi from this site (236 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.