DuPage County, Illinois

DataCentersExposed tracks 10 AI data centers in DuPage County, Illinois — 6 operating and 0 in the pipeline, led by NTT Global Data Centers. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

DuPage County, Illinois has 10 tracked data centers, 6 of them operating. Its composite data-center risk score is 15 out of 100 — see the breakdown above for which factors drive it.

Facilities
10
Operating
6
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
15Low
  • Project exposure · 27
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in DuPage County

NTT Global Data Centers has the largest presence in DuPage County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

10 facilities

Every tracked facility

FacilityOperatorStatusMW
Centersquare Elk Grove Village Data Center Campus ORD2
Elk Grove Village
CenterSquare (formerly Cyxtera)Operating
Centersquare Lisle ORD4 Data Center
Lisle
CenterSquare (formerly Cyxtera)Operating
CyrusOne CHI3
Aurora
CyrusOne LLCMapped (unverified)
CyrusOne Chicago Aurora CME
Aurora
CyrusOne LLCOperating
Datacenter (386)Mapped (unverified)
Edged Chicago ORD01Mapped (unverified)
Element Critical CH1
Wood Dale
Element CriticalOperating
Equinix Chicago Data CH7Equinix, Inc.Operating
Lincoln RackhouseOperating
NTT Chicago CH3
Itasca
NTT Global Data CentersMapped (unverified)
Accountability

County commissioners

How the DuPage County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.