Edged Chicago ORD01 is a mapped data center in DuPage County, IL. DataCentersExposed has documented 72 MW of reported power capacity and a 116,197 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Power
72 MW
Footprint
116,197 sq ft
Interconnection
~17 MW
Utility
Commonwealth Edison Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Edged Chicago ORD01 is a mapped data center in DuPage County, Illinois, operated under the Edged data center brand. Its reported footprint is 116,197 square feet. The site draws power from Commonwealth Edison Co inside the PJM grid. Ownership above the Edged operation is not disclosed in available records.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.7 mi
Electric Light 345 Kv · 345 kV
Transmission line
0.6 mi
345 kV line
Municipal water
Served
Aurora

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Data-center discussions in DuPage County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Aurora City Council
Dec 8, 2020 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Illinois reported $983.2M in Data Center Investment Program — state & local sales/use tax exemption (20 ILCS 605/605-1025; administered by DCEO) (2019-2024 (27 certified data centers; cumulative estimated exemption value)) (Illinois Department of Commerce and Economic Opportunity (DCEO)). Program-wide, not attributable to this site.

source · All Illinois subsidies →

Water use

Modeled estimate~318.4K gpd
Direct (onsite cooling)
~155.2K gpd
Indirect (its electricity)
~163.2K gpd

No measured record exists, so this is a low-confidence model from 17 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Environmental permits

source: Permit register
  • Clean Air Act permitted sourceIL000043407AEA
    NAICS 518210; ECHO compliance status: No Violation Identified

What this site costs the grid

source: PJM RPM auction reports
ComEd (Illinois) · 2027/28 auction
$333 /MW-day
Peaked at $188/MW-day in 2020/21 2.46× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's COMED pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$8.8M/yr

72 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
55
PM2.5
Moderate

Air Quality Index from the nearest AirNow reporting area (Aurora and Elgin), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$177.8K
People of color
41%
Below poverty
2%
Tract population
4,293

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Metea Valley High School in Aurora, is 1.1 mi from this site (2,715 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.