DataCentersExposed tracks 29 AI data centers in Fulton County, Georgia — 11 operating and 9 in the pipeline, drawing 969 MW of reported power demand, led by Microsoft Corporation. Its transparent data-center risk score is 0/100.
Sources: Methodology, Coverage scorecard
Reporting by Eric Keller · Updated May 29, 2026
- Project exposure · 28
- Power demand · 0
- Water draw · n/a
- Land footprint · n/a
What's happening in Fulton County
Facilities here with disclosed capacity draw 969 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.
Microsoft Corporation has the largest presence in Fulton County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.
Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.
2035 Buildout Outlook
Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 6 standardized 36 MW campuses in Fulton County by 2035 — roughly 216 MW of new electricity demand and ~209 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 17 campuses (612 MW). For scale, we currently track 29 real data centers in Fulton County (969 MW of reported power).
- Low growth4144 MW · ~139 M gal/yr cooling water
- Moderate growth6216 MW · ~209 M gal/yr cooling water
- High growth8288 MW · ~279 M gal/yr cooling water
- Higher growth17612 MW · ~592 M gal/yr cooling water
The model assigns ~100% of these campuses' cooling to evaporative water cooling in Fulton County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.
These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.
Every tracked facility
| Facility | Operator | Status | MW |
|---|---|---|---|
| ATL03/Red Oak Union City | TA Realty LLC, Brightstar Commercial Properties LLC | Proposed | 150 |
| Data Bank ATL5 Data Center Litha Springs | DataBank Holdings, Ltd. | Proposed | 72 |
| Fairburn Technology Center Fairburn | Bohannon Road Venture, LLC. | Proposed | — |
| Stonewall Tell Data Center Atlanta | RSC Investment Management LLC | Proposed | — |
| T5 Atl IV Fairburn | — | Proposed | — |
| Union City Data Center Union City | — | Proposed | — |
| Vantage Data Centers Stacks Road Campus Atlanta | — | Proposed | — |
| Vantage: Westlake Project Atlanta | — | Proposed | — |
| Microsoft Union City Data Center Campus College Park | Microsoft Corporation | Under construction | 324 |
| Westlake South Fulton | Vantage Data Centers Holdings, LLC | 113 | |
| Stacks/College Park College Park | Vantage Data Centers Holdings, LLC | 105 | |
| QTS Atlanta Data Center 1 Atlanta | QTS Realty Trust, LLC | 70 | |
| East Point Campus East Point | Microsoft Corporation | 38 | |
| Palmetto Campus Palmetto | Microsoft Corporation | 38 | |
| Edged ATL01-1 Atlanta | Edged | 27 | |
| Ascent - Atlanta Data Center | Prime Data Centers | Mapped (unverified) | 12 |
| Enterprise Services, LLC ALPHARETTA | — | Mapped (unverified) | 11 |
| Flexential Atlanta - Alpharetta Data Center Alpharetta | Flexential Corp. | 6 | |
| Atlanta ATL13 Atlanta | Digital Realty Trust, Inc. | 3 | |
| CoreSite AT1 Atlanta | American Tower Corporation | — | |
| Cox Data Center | Prime Data Centers | Mapped (unverified) | — |
| Digital Realty Data Center Atlanta | Digital Realty Trust, Inc. | Mapped (unverified) | — |
| Google Fiber | Alphabet Inc. | Mapped (unverified) | — |
| Hewlett-Packard | — | Mapped (unverified) | — |
| Mapletree Industrial Alpharetta | — | Mapped (unverified) | — |
| Secure Data Center | Prime Data Centers | Mapped (unverified) | — |
| Strategic Datasphere Alpharetta | — | Mapped (unverified) | — |
| Sungard Availability Services Atlanta Data Center Atlanta | Sunguard | — | |
| T5 Data Center Alpharetta | Prime Data Centers | — |