Skip to content
DataCentersExposed
County data-center profile

Fulton County, Georgia

DataCentersExposed tracks 14 AI data centers in Fulton County, Georgia — 5 operating and 0 in the pipeline, led by Prime Data Centers. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Fulton County, Georgia has 14 tracked data centers, 5 of them operating. Its composite data-center risk score is 16 out of 100 — see the breakdown above for which factors drive it.

Facilities
14
Operating
5
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
16Low
  • Project exposure · 28
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Fulton County

Prime Data Centers has the largest presence in Fulton County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

14 facilities

Every tracked facility

FacilityOperatorStatusMW
Ascent - Atlanta Data CenterPrime Data CentersMapped (unverified)
Atlanta ATL13
Atlanta
Digital Realty Trust, Inc.Operating
CoreSite AT1
Atlanta
American Tower CorporationOperating
Cox Data CenterPrime Data CentersMapped (unverified)
Digital Realty Data Center
Atlanta
Digital Realty Trust, Inc.Mapped (unverified)
Enterprise Services, LLC
ALPHARETTA
Mapped (unverified)
Flexential Atlanta - Alpharetta Data Center
Alpharetta
Flexential Corp.Operating
Google FiberAlphabet Inc.Mapped (unverified)
Hewlett-PackardMapped (unverified)
Mapletree Industrial
Alpharetta
Mapped (unverified)
QTS Atlanta Data Center 1
Atlanta
QTS Realty Trust, LLCOperating
Secure Data CenterPrime Data CentersMapped (unverified)
Strategic Datasphere
Alpharetta
Mapped (unverified)
T5 Data Center
Alpharetta
Prime Data CentersOperating
Accountability

County commissioners

How the Fulton County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.