Vantage Data Centers Stacks Road Campus

Atlanta, Fulton County, GA

Source: Primary source

Vantage Data Centers Stacks Road Campus is a proposed data center in Fulton County, GA. DataCentersExposed has documented a 696,980 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Campaign · Decision pending

Take action

Fulton, Georgia

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Hearing timeline

  1. Board of Commissioners

    Wed, Aug 5, 2026 · 10:00 AM EDT

    Board of Commissioners: Discussion: Data Centers: 2026 growth in assessed value (Ellis) (DISCUSSED) HEARD AFTER ITEM #26-0461

  2. Board of Commissioners

    Wed, Aug 5, 2026 · 10:00 AM EDT

    Board of Commissioners: data-center item — Request approval of a Resolution by the Fulton County Board of Commissioners opposing the provision of tax abatements or other financial incentives by any Development Authority within Fulton County for Data Center Projects; urging the Development Authority

    AgendaMeeting detailsvia Legistar · medium confidence

Never miss a meeting: subscribe in your calendar · download .ics

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Operator
Est. capacity
~130-280 MW
Footprint
696,980 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.6 mi
Unknown111557 · 230 kV
Transmission line
716 ft
230 kV line
Municipal water
Served
Atlanta

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In public meetings

Where this facility is discussed in the verbatim record of public government meetings. Captions are auto-generated and uncorrected.

  • Board of CommissionersAug 5, 2026

    “…Commissioners opposing the provision of tax abatements or other financial incentives by any Development Authority within Fulton County for Data Center Projects; urging the Development Authority of Fulton County to decline to entertain or approve any such incentive; and for other purposes. (Thorne/Ellis) 57. [26-0462…”

    Read the transcript · 2 mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.

source · All Georgia subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Feldwood Elementary School in College Park, is 1.1 mi from this site (688 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.