Ascent - Atlanta Data Center

Fulton County, GA

Source: OpenStreetMap

Ascent - Atlanta Data Center is a mapped data center in Fulton County, GA, operated by Prime Data Centers. DataCentersExposed has documented a 595,318 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Prime Data Centers
Operator
Prime Data Centers
Est. capacity
~110-240 MW
Footprint
595,318 sq ft
Utility
Georgia Power Co
Grid
SOCO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Ascent - Atlanta Data Center is a mapped colocation site in Fulton County, GA, operated by Prime Data Centers under the Ascent data center banner. The building covers 595,318 square feet and draws power from Georgia Power Co within the SOCO balancing authority. Public records do not yet detail a corporate parent above Prime Data Centers.

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.

source · All Georgia subsidies →

Water use

Modeled estimate~103.5K gpd
Direct (onsite cooling)
~50.7K gpd
Indirect (its electricity)
~52.8K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in SOCO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Environmental permits

source: Permit register
  • Clean Air Act permitted sourceGA0000001312100941
    NAICS 518210; ECHO compliance status: No Violation Identified
  • Clean Air Act permitted sourceGA0000001312100972
    NAICS 518210; ECHO compliance status: No Violation Identified

Air quality near this site

source: AirNow
51
PM2.5
Moderate
16
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Gainesville), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$157.7K
People of color
50%
Below poverty
17%
Tract population
4,614

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, New Prospect Elementary School in Alpharetta, is 0.4 mi from this site (504 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.