North Dakota

DataCentersExposed tracks 12 AI data centers in North Dakota — 5 operating and 2 in the pipeline — across 5 counties, drawing 1.5 GW of reported power demand from 1 tracked corporate operator. North Dakota's data-center tax break cost the state $19.4M in forgone revenue in FY2024 — $40.9M cumulatively.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
12
data centers
Operating
5
live today
Pipeline
2
proposed / building
Demand
1.5 GW
5 w/ capacity
Counties
5
touched
Operators
1
corporate parents
The story so far

North Dakota at a glance

The largest footprint in North Dakota belongs to Applied Digital Corporation, behind 1 tracked facility. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Cass County leads North Dakota with 3 facilities and a composite risk score of 6/100. Dickey County and Stutsman County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

North Dakota is not done growing. 2 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 1 state bill mentioning data centers and 6 recent news items are tracked for North Dakota below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 8 standardized 36 MW campuses in North Dakota by 2035 — roughly 288 MW of new electricity demand and ~279 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 48 campuses (1.7 GW). For scale, we currently track 12 real data centers in North Dakota (1.5 GW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth6
    216 MW · ~209 M gal/yr cooling water
  • Moderate growth8
    288 MW · ~279 M gal/yr cooling water
  • High growth23
    828 MW · ~801 M gal/yr cooling water
  • Higher growth48
    1.7 GW · ~1.7 billion gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in North Dakota (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

Who's building

Top operators in North Dakota

What the tax break costs

The taxpayer price tag

via North Dakota Legislative Council
$19.4Min forgone state revenue, FY2024
$40.9M cumulative (TY2021-TY2024)
The reported tax for the sales tax exemption for technology equipment and computer software used in a qualified data center totaled $12,359,395 in tax years 2021 and 2022 combined, $9,147,273 in tax year 2023, and $19,390,865 in tax year 20…

Program-wide cost of North Dakota's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Cass County316
Dickey County14
Stutsman County14
Williams County2
Burleigh County11
Still contested

Pipeline & proposals

12 of 12 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Aurum Capital VenturesProposedBurleigh
Applied Digital: Polaris Forge 2Under constructionCass280
Project Fighting PikeCritical Data HouseOperatingWilliams455
Applied Digital / Ellendale Data CenterApplied Digital CorporationOperatingDickey400
Atlas PowerOperatingWilliams240
Apld Jamestown DatacenterOperatingStutsman100
702 Communications - Fargo, NDMapped (unverified)
Applied DigitalMapped (unverified)Cass
DCN Dakota Carrier Networks BismarckMapped (unverified)
Dakota Carrier NetworkOperatingCass
Midco FargoMapped (unverified)
Midco Grand ForksMapped (unverified)

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.