Applied Digital: Polaris Forge 2
Harwood, Cass County, ND
Source: Primary source
Applied Digital: Polaris Forge 2 is a under construction data center in Cass County, ND. DataCentersExposed has documented 280 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkNo public comment allowed at public meeting on this project. Fargo announced it planned to stop it's plan to annex the data center in Dec 2025 Announced investment: $3.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Port: But what about everybody else's property rights?InForum· Jun 27, 2026
- Guest column: North Dakota can have both data centers and democracyInForum· Jun 19, 2026
- Port: What does a good data center look like?InForum· Jun 17, 2026
- McFeely: You have no chance in data center fight, ND residentsInForum· Jun 13, 2026
- State officials push back on A.I. data center ‘misinformation’The Mighty 790 KFGO· Jun 4, 2026
- McFeely: Slam the brakes on data centersInForum· May 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
North Dakota reported $19.4M in Qualified Data Center sales/use tax exemption for enterprise IT equipment & computer software (N.D.C.C. § 57-39.2-04.17) for FY2024 (North Dakota Legislative Council / Office of State Tax Commissioner (testimony)). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Harwood Elementary School in Harwood, is 1.2 mi from this site (123 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.