Asia · data-center footprint
Israel
DataCentersExposed tracks 2 AI data centers in Israel — 0 operating and 0 in the pipeline — across 2 districts.
Sources: Methodology, Coverage scorecard
What powers Israel's data centers
Ember · 2025Carbon intensity
493
gCO₂/kWh
Clean electricity
renewables + nuclear
Fossil electricity
83%
coal, gas & oil
Grid demand
76
TWh / year
Demand growth
+2.5%
per year
Israel's electricity demand has grown +2.5%/yr (2015–2025). Every new data center competes for that same grid — already 41 MtCO₂ a year from generation.
Tracked
2
Operating
0
In pipeline
0
Reported power
0 MW
districts
2
Operators
0
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
By district
Where the data centers are
Facilities
Tracked data centers
- סרברפארםCenterMapped (unverified)
- רד תקשורת מחשביםJerusalemMapped (unverified)
In the local press
Latest Israel data-center coverage
- גוגל תשקיע $1.5 מיליארד בהרחבת מרכז נתונים באלבמה מאת Investing.comInvesting.com Israel· Jun 16, 2026
- VisionWave תרכוש 51% ממיזם מרכז נתונים ישראלי מאת Investing.comInvesting.com Israel· Jun 16, 2026
- AI data center pollutionIsrael Defense· Jun 13, 2026
- מנית Black Hills קופצת בעקבות עדכון על פרויקט מרכז נתונים מאת Investing.comInvesting.com Israel· Jun 10, 2026
- מטא פלטפורמס תשתף פעולה עם רליאנס אינדסטריז להקמת מרכז נתונים לבינה מלאכותית בהודו מאת Investing.comInvesting.com Israel· Jun 10, 2026
- OpenAI במשא ומתן לחכירת מרכז נתונים של 10 ג’יגה-וואט באוהיו עם תמיכה של Nvidia מאת Investing.comInvesting.com Israel· Jun 10, 2026
Live headlines via Google News — in English and Israel's local press.