Mapped (unverified)colocation
EdgeConneX Tel Aviv (EDCTLV01)
Herzliya, Tel-Aviv, Israel
Source: Primary source
EdgeConneX Tel Aviv (EDCTLV01) is a mapped data center in Tel-Aviv, Israel. It runs on Israel's grid, which was 83% fossil-fuelled at 493 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
493 gCO₂/kWh
Clean electricity
17%
Region
Tel-Aviv
Overview
source: linkEdgeConneX Inc. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
493 gCO₂/kWh
Clean electricity
17%
Fossil electricity
83%
National grid context, not this facility's own metering. Full country picture: Israel data centers.
In the news
source: Google News (local + English)- מנכ"ל אנבידיה לוואלה: "ההשלכות של בניית תשתית AI בישראל הן עמוקות"וואלה טכנולוגיה· Feb 4, 2026
- 4,000 מעבדי NVIDIA Blackwell: זה דאטה-סנטר ה-AI החדש בישראלגיקטיים· Oct 20, 2025
- בלעדי: אנבידיה מקימה חוות שרתים בישראל בלמעלה מ-500 מיליון דולרגלובס· Jan 15, 2025
- EdgeConneX האמריקאית רוכשת את גלובל דטה סנטרTechtime· Aug 16, 2021
- גלובל דטה סנטר מקימה חוות שרתים בהשקעה של 100 מיליון שקלTechtime· Mar 31, 2020
- "אנו עוברים מ-Data Center - ל-Centers of Data" -אנשים ומחשבים· Feb 20, 2019
See something wrong or missing on this page? Suggest a correction.