Mapped (unverified)colocation
TIS Tel Aviv Burla Hub and Data Center
Tel Aviv, Tel-Aviv, Israel
Source: Primary source
TIS Tel Aviv Burla Hub and Data Center is a mapped data center in Tel-Aviv, Israel. It runs on Israel's grid, which was 83% fossil-fuelled at 493 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
493 gCO₂/kWh
Clean electricity
17%
Region
Tel-Aviv
Overview
source: linkTelecom Italia Sparkle S.p.A. — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
493 gCO₂/kWh
Clean electricity
17%
Fossil electricity
83%
National grid context, not this facility's own metering. Full country picture: Israel data centers.
In the news
source: Google News (local + English)- Nebius in talks to acquire AI21 Labs - reportגלובס· Apr 9, 2026
- Stark Power raises NIS 215m on TASE for US projectsגלובס· Mar 26, 2026
- Ormat signs $200m data centers dealגלובס· Jan 13, 2026
- Tue: Azrieli leads TASE gainsגלובס· Dec 30, 2025
- Clean energy co Phinergy teams with Google and Microsoftגלובס· Oct 27, 2025
- נביוס השיקה את את ה-AI Data Center הראשון בארץ, עם פריסת NVIDIA Blackwellגיקטיים· Oct 20, 2025
See something wrong or missing on this page? Suggest a correction.