Indonesia · province
Jawa Barat
DataCentersExposed tracks 30 AI data centers in Jawa Barat, Indonesia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 4 tracked operators.
Sources: Indonesia, Methodology
Tracked
30
Operating
0
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- Mapped (unverified)
- Area31PT. Dunia Virtual OnlineMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- GTN Data CenterGraha Teknologi NusantaraMapped (unverified)
- Graha Teknologi BekasiGraha Teknologi NusantaraMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Nodeast Cloud (srv01.kehidupan)PT Era Daya CiptaMapped (unverified)
- STT Jakarta 1STT GDCMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Jawa Barat data-center coverage
- Danantara bersiap untuk perluas investasi ke pusat data seiring permintaan tinggiANTARA News Jawa Barat· Aug 27, 2026
- NeutraDC Gandeng PLN, Siapkan Energi 200 MW untuk Ekspansi Data Center, Target Jadi Pusat Digital Terbesar di Indonesia – Berita Hari IniUniversitas Teknokrat Indonesia· Aug 24, 2026
- Data Center Dominasi Serapan Lahan Industri, Cilegon Berpotensi Jadi Klaster EVSWA.co.id· Aug 20, 2026
- 80 Persen Permintaan Lahan Industri dari Pusat DataTempo.co· Aug 18, 2026
- Sinergi Danantara, NeutraDC Gandeng PLN Ekspansi Data Center Cikarang Ditargetkan Capai 200 MWkonstruksimedia.com· Aug 18, 2026
- Bagaimana Indonesia Jadi Target Pusat Data setelah SingapuraTempo.co· Aug 18, 2026
Live headlines via Google News — in English and Indonesia's local press.