Mapped (unverified)colocation
DCI Indonesia (JK6)
Bekasi, Jawa Barat, Indonesia
Source: Primary source
DCI Indonesia (JK6) is a mapped data center in Jawa Barat, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Jawa Barat
Overview
source: linkDCI Indonesia — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Cikarang Jadi Magnet Data Center, PLN Siapkan Pasokan Listrik hingga 200 MWiNews.ID· Aug 28, 2026
- Bukan Cuma Listrik, BeFa Sulap Kawasan Industri Bekasi Jadi 'Surga' AI dan Data CenterIndustry.co.id· Aug 28, 2026
- Incar Investasi AI dan Data Center, Bekasi Fajar (BEST) Siapkan Ekosistem AI-ReadyBisnis.com - Ekonomi· Aug 28, 2026
- Bekasi Fajar (BEST) Siapkan Kawasan Industri AI-Ready, Bidik Peluang dari Data Centerkontan.co.id· Aug 28, 2026
- Bekasi hingga Cikarang Jadi Lokasi Incaran Investor Data CenterBisnis.com - Ekonomi· Jul 30, 2026
- Indonet Resmi Aktifkan Internet Wilayah Industri Bekasi dan KarawangArenaLTE.com· Jul 8, 2026
See something wrong or missing on this page? Suggest a correction.