Mapped (unverified)colocation
DCI Indonesia (H2-01)
Karawang, Jawa Barat, Indonesia
Source: Primary source
DCI Indonesia (H2-01) is a mapped data center in Jawa Barat, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Jawa Barat
Overview
source: linkDCI Indonesia — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Dukung Bisnis Digital dan Data Center, PLN Perkuat Kelistrikan Industri Karawang - Koran GalaKoran Gala· Jun 8, 2026
- PLTS Terapung untuk Data Center Amazon Tersendat, Pengembang Lapor PurbayaBisnis.com· May 7, 2026
- PLN Rampungkan Infrastruktur Listrik Data Center Microsoft di Cikarang dan KarawangSWA.co.id· Apr 29, 2026
- Proyek Rampung, PLN Siap Pasok Listrik Data Center Raksasa MicrosoftCNBC Indonesia· Apr 29, 2026
- Dukung Ekonomi Digital, PLN Rampungkan Infrastruktur Listrik Data Center Microsoft di Karawang dan CikarangKlikJatim· Apr 29, 2026
- PLN Perkuat Infrastruktur Listrik Data Center Microsoft di Jabar, Dorong Transformasi Digital Nasional - Desk JabarDesk Jabar· Apr 14, 2026
See something wrong or missing on this page? Suggest a correction.