Mapped (unverified)colocation
XINON Graz
Graz, Steiermark, Austria
Source: Primary source
XINON Graz is a mapped data center in Steiermark, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Steiermark
Overview
source: linkXINON — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Klimaneutral!? – Keine Sorge, eh nur ein bisschenZeitung der Arbeit· Aug 28, 2026
- Baustart für neues KI-Rechenzentrum auf 3.000 Quadratmetern im Süden von GrazWelt Stimme· Aug 27, 2026
- Nexspace startet Bau des Rechenzentrums in GrazDataCenter-Insider· Aug 27, 2026
- Auf 3.000 Quadratmetern im Süden von Graz: Baustart für neues KI-Rechenzentrum in GrazMeinBezirk.at· Aug 27, 2026
- KPÖ Graz: Zukunftsinvestitionen für das KapitalZeitung der Arbeit· Aug 26, 2026
- Spatenstich für neues Datacenter in Grazsteiermark.ORF.at· Aug 26, 2026
See something wrong or missing on this page? Suggest a correction.