Austria · state
Steiermark
DataCentersExposed tracks 3 AI data centers in Steiermark, Austria — 1 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 3 tracked operators.
Sources: Austria, Methodology
Tracked
3
Operating
1
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- T-Mobile Rechenzentrum GrazT-Mobile / MagentaMapped (unverified)
- Telekom-TowerA1 / Telekom AustriaMapped (unverified)
- earthDATAsafeKapsch BusinessCom
In the local press
Steiermark data-center coverage
- Nach 18 Jahren Planung: Google baut erstes Rechenzentrum in ÖsterreichKleine Zeitung· Apr 23, 2026
- Warum Rechenzentren für ein Land wichtig sind und worauf zu achten istDer Standard· Jan 20, 2026
- Österreichisches Umweltzeichen: 25 Unternehmen ausgezeichnetdie-wirtschaft.at· Nov 5, 2025
- Den Ressourcenverbrauch von KI in der Erwachsenenbildung vermitteln : Nachrichten : AktuellesErwachsenenbildung.at· Oct 22, 2025
- NIS-2 und konzerninterne RechenzentrumsdiensteDeloitte· May 26, 2025
- KI: Welches Start-up eines der drängendsten Probleme von Rechenzentren löstHandelsblatt· Feb 25, 2025
Live headlines via Google News — in English and Austria's local press.