Mapped (unverified)colocation
EXA Edge DC Graz
Graz, Steiermark, Austria
Source: Primary source
EXA Edge DC Graz is a mapped data center in Steiermark, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Steiermark
Overview
source: linkEXA Infrastructure — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- RRZ stellt mit AI Factory hochsichere KI für Österreich zu Verfügungwko.at· Jun 2, 2026
- Nach 18 Jahren Planung: Google baut erstes Rechenzentrum in ÖsterreichKleine Zeitung· Apr 23, 2026
- semify: Die Grazer Chip-Boutique auf WachstumskursKleine Zeitung· Mar 27, 2026
- Wirtschaftskammer Steiermark plant Garage mit 646 Parkplätzen in GrazDer Grazer· Mar 15, 2026
- Nexspace kündigt mit Standort Stuttgart einen Wachstumskurs anDataCenter-Insider· Feb 5, 2026
- 25 Jahre: Dieses Unternehmen brachte Wlan nach VoitsbergKleine Zeitung· Dec 18, 2025
See something wrong or missing on this page? Suggest a correction.