Mapped (unverified)
Urbacon Data Centre
Ontario, Canada
Source: OpenStreetMap
Urbacon Data Centre is a mapped data center in Ontario, Canada. DataCentersExposed has documented a 163,121 sq ft footprint at this site. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~30-70 MW
Footprint
163,121 sq ft
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Urbacon Achieves a Series of Firsts with $320M Data Centre ABS Refinancing DealConnect CRE Canada· May 21, 2026
- Top 10: Data Centre Companies in CanadaData Centre Magazine· Jan 14, 2026
- Canada Data Center Colocation Market Supply & Demand Analysis Report 2025-2030: 111 Existing Facilities, 29 Upcoming Across 20+ Locations by White Floor Space, Load Capacity, Pricing TrendsData Centre Magazine· Oct 22, 2025
- Cologix acquires 100% stake in two Toronto data centresRENX· Sep 19, 2025
- UDCS secures $320M financing to expand GTA data centresRENX· Sep 11, 2025
- UDCS Secures $320M in Financing for Toronto Data Centre Expansion ProjectConnect CRE Canada· Sep 11, 2025
See something wrong or missing on this page? Suggest a correction.