Mapped (unverified)colocation
Bell Toronto
Toronto, Ontario, Canada
Source: Primary source
Bell Toronto is a mapped data center in Ontario, Canada, operated by Bell Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Bell Canada
Operator
Bell Canada
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkBell Canada (formally Group Telecom) — colocation facility (6 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentBell Canada
- Files asBell Canada
- This facilityBell Toronto
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Construction of Bell Canada’s AI data centre in Saskatchewan scaling upToronto Star· Oct 1, 2026
- Bell Canada marks construction milestone of Sask. AI Data Centre and $1M mental health commitmentCTV News· Oct 1, 2026
- Dozens show up to RM of Sherwood in protest of Bell AI data centreCBC· Sep 23, 2026
- The AI Data Centre-Driven Privatization of SaskPower Is Underway. You Knew It Was Coming.Tammy Robert | Substack· Sep 20, 2026
- Bell AI data centre expansion in Sask. announced at investment summitconstructconnect.com· Sep 15, 2026
- Canada’s Bell to triple capacity at planned Saskatchewan data center campusBeBeez International· Sep 15, 2026
See something wrong or missing on this page? Suggest a correction.