Mapped (unverified)
Ascent TOR1
Ontario, Canada
Source: OpenStreetMap
Ascent TOR1 is a mapped data center in Ontario, Canada, operated by Ascent, LLC. DataCentersExposed has documented a 367,901 sq ft footprint at this site. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Ascent, LLC
Operator
Ascent, LLC
Est. capacity
~70-150 MW
Footprint
367,901 sq ft
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkAscent TOR1 is a data center in Ontario, Canada, operated by Ascent, LLC. The mapped site covers 367,901 square feet. Beyond the operator's own filing, the ultimate corporate parent and any public subsidies tied to the project remain undisclosed in the records available here.
Operator chain
- Ultimate parentAscent, LLC
- Files asAscent, LLC
- This facilityAscent TOR1
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Region to study data centre impacts on water, power supply and environmentCambridgeToday.ca· Aug 12, 2026
- Investigation into Cambridge stormwater spill shows 'no evidence of contaminants of concern,' province saysCBC· Jul 30, 2026
- ‘Milky white substance’ in Cambridge stormwater pond believed to be bacterial bloomCTV News· Jul 28, 2026
- Cleanup underway following spill near Maple Grove Road data centreCambridgeToday.ca· Jul 23, 2026
- We found every data centre in CanadaThe Logic· Apr 8, 2026
- CapitaLand Ascendas REIT invests $1.4 billion in two Singapore assets, Japan data centreThe Straits Times· Mar 24, 2026
See something wrong or missing on this page? Suggest a correction.