UltraEdge Lille
Lille, Hauts-de-France, France
Source: Primary source
UltraEdge Lille is a mapped data center in Hauts-de-France, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Hauts-de-France
Overview
source: linkUltraEdge — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Le projet du data center de Microsoft près de Mulhouse reçoit un avis favorable, il doit occuper environ 35 hectaresBFM· Aug 24, 2026
- 17 000 m² supplémentaires : le plus grand data-center de la Métropole de Lyon veut doubler sa superficieLyon Capitale· Jul 28, 2026
- Voisins d’un centre de données Microsoft, des Américains se plaignent du bruit et poursuiventMaVille.com· Jul 8, 2026
- «On établit les hypothèses de températures maximales des 20 prochaines années en se basant sur le passé» : pourquoi les canicules affectent autant les datacentersL'Usine Nouvelle· Jul 7, 2026
- Un datacenter de 150 000 m² est en projet à La Chapelle-d’Armentières : voici ce que l’on saitLa Voix du Nord· Jul 3, 2026
- Imbroglio autour d’un projet de data center : la MEL mène-t-elle une « concertation fantoche » ?La Voix du Nord· Jun 29, 2026