Ate data center, Hauts-de-France, France
Hauts-de-France, France
Source: OpenStreetMap
Ate data center in Hauts-de-France, France is a mapped facility, operated by Ate. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkAte is a mapped data center in France, operated by Ate. Available records do not identify an ultimate corporate parent, and no capacity, footprint, or environmental enforcement figures are disclosed for the site. Its status remains limited to a basic listing pending further documentation.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- « Tout un projet de société que l’on conteste » : à Mulhouse, des habitants mobilisés contre un projet de data centerOuest-France· Aug 28, 2026
- Mulhouse. Data center Microsoft à Petit-Landau : les opposants manifestent devant la sous-préfectureL'Alsace· Aug 28, 2026
- Avis favorable à la construction d'un data center dans le sud de l'Alsace, la mobilisation contre le projet continueFrance 3 Régions· Aug 28, 2026
- Data center de Rantigny : à peine annoncée, la prolongation de l'enquête publique déjà avortéeOise Hebdo· Aug 28, 2026
- Lidl va investir jusqu’à 5,6 milliards d’euros dans un immense data center en AllemagneClubic· Aug 28, 2026
- Saint-André veut son data center à Bois-RougeLe Quotidien de La Réunion· Aug 28, 2026