Mapped (unverified)
CIV Anzin
Anzin, Hauts-de-France, France
Source: OpenStreetMap
CIV Anzin is a mapped data center in Hauts-de-France, France. DataCentersExposed has documented a 18,773 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
18,773 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Hauts-de-France
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- De nombreux emplois à la clé mais beaucoup d’énergie consommée : c’est quoi un data center exactementLa Voix du Nord· Feb 10, 2025
- Data center d’Anzin : « un service de proximité » qui ne demande qu’à grandirLa Voix du Nord· Apr 15, 2024
- Etix Everywhere : dans les entrailles d’un data center à AnzinLa Voix du Nord· Apr 15, 2024
- Data center de CIV à Anzin/Valenciennes : bientôt deux ans !La Gazette France· Mar 2, 2018
- Le CIV, entreprise pour le numérique utile !VA INFOS· Apr 26, 2017
- Parc des Rives Créatives de l'EscautVilles internet· Oct 11, 2015
Environmental permits
source: Géorisques (ICPE)- SUEZ RV NORD EST0007002234ICPE Enregistrement · Anzin 59410 · registered as "SUEZ RV NORD EST" · ~271 m from the mapped location