Switch Datacenters AMS2
Utrecht, Netherlands
Source: OpenStreetMap
Switch Datacenters AMS2 is an operating data center in Utrecht, Netherlands. DataCentersExposed has documented a 28,614 sq ft footprint at this site. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Est. capacity
~5-15 MW
Footprint
28,614 sq ft
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Utrecht
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Switch Datacenters omzeilt bouwstop via vergroeningsplanComputable.nl· Jul 22, 2026
- Switch Datacenters realiseert 10 GbE dark fiber interconnects tussen zijn datacenters in Amsterdam Zuidoost en WoerdenEmerce· Jun 9, 2016
- Switch Datacenters details 90MW Warsaw data centerData Center Dynamics· Jul 31, 2025
- Iron Mountain linked to data center development in North Holland - reportData Center Dynamics· Feb 22, 2025
- Dutch operator Switch Datacenters expands into Poland, plans 30MW Warsaw data centerData Center Dynamics· Oct 11, 2024
- The ongoing impact of Amsterdam's data center moratoriumData Center Dynamics· Aug 22, 2024
See something wrong or missing on this page? Suggest a correction.