Dataplace data center, Utrecht, Netherlands
Utrecht, Netherlands
Source: OpenStreetMap
Dataplace data center in Utrecht, Netherlands is a mapped facility, operated by Dataplace. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkDataplace is a mapped data center in the Netherlands, operated by Dataplace. Available records identify the operator but do not disclose an ultimate parent company, reported power capacity, footprint, or any environmental enforcement history for the site.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Felton ICT Services kiest voor twin-datacenter van DataplaceDutch IT Channel· Apr 6, 2023
- Dataplace opent zesde Tier III datacenter in HoofddorpDutch IT Channel· Apr 6, 2023
- Gerben van der VeenQuote Net· Aug 21, 2020
- Datacenter Nedzone nu onder de paraplu van DataplaceKijk op Steenbergen· Nov 28, 2019
- Zo word je datacenter engineerComputable.nl· Jun 28, 2017
- Dataplace stapt volledig over op duurzame groene energieHet Kontakt· Jan 26, 2017