Alticom - IJsselstein is a mapped data center in Utrecht, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Utrecht
Overview
source: linkAlticom Facility Management — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- CBRE verhuurt DC Nieuwegein aan DefensiePropertyNL· Mar 4, 2026
- Torenbedrijf Cellnex - bekend van de enorme kerstboom langs de A2 - speelt miljardenspel op grote hoogteDe Telegraaf· Mar 6, 2025
- Cellnex vult behoefte van datacenter ruimte zo goed mogelijk inDutch IT Channel· Mar 15, 2022
- Het dubbelleven van de televisietorensNRC· Nov 27, 2020
- Cellnex gaat datacenter bouwen in zendmast Loon op ZandMediaMagazine.· Dec 15, 2019
- Nederlands hoogste constructie voorzien van detectie- en blussysteemCobouw· Sep 19, 2019
See something wrong or missing on this page? Suggest a correction.