STAMP Data Center
Alabama, Genesee County County, NY
Source: Primary source
STAMP Data Center is a proposed data center in Genesee County County, NY, operated by Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum. DataCentersExposed has documented 500 MW of reported power capacity and a 2,200,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Genesee, New York
STAMP Data Center in Alabama, NY is contested. Organized Advocacy | Petition: https://www.change.org/p/prevent-stamp-from-destroying-vital-wetlands-in-iroquois-nwr-no-data-centers?source_location=topics_page | Group: https://alliesoftsn.weebly.com/no-data-centers-at-stamp.html | A public hearing is being held March 19 at 7:00 PM in the town of Alabama on Judge Rd. Public comments being accepted through March 31: https://docs.google.com/document/d/1V9JcpmERQ7EZ5vxm9KiaX6AqYO6XUkpuCELwxKIxHKs/edit?usp=drivesdk Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
500 MW of new demand — roughly a city of 400,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in NY is 29.4¢/kWh, up 14.6% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkThe site plan includes 775 acres of impervious surface cover (ISC) in the form of roads, parking lots, roofs, and other infrastructure acres dedicated to data center) Announced investment: $0.41. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asGenesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum
- This facilitySTAMP Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELTNo recent coverage found for this facility.
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Oakfield-Alabama Elementary School in Oakfield, is 6.0 mi from this site (351 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.