operator
Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum
DataCentersExposed tracks 1 data center operated by Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum across 1 state, of which 1 is proposed or under construction, with 500 MW of reported power capacity.
Operator added from the FracTracker Alliance U.S. Data Centers Tracker.
Reporting by Eric Keller
Facilities
1
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
500 MW
1 facilities
Where Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum builds
| Facility | Location | Status | MW |
|---|---|---|---|
| STAMP Data Center | Alabama, NY | Proposed | 500 |