Mapped (unverified)colocation
PureColo Ottawa DC1
Ottawa, Ontario, Canada
Source: Primary source
PureColo Ottawa DC1 is a mapped data center in Ontario, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkPureColo Inc. — colocation facility (17 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Alberta pitches cheap natural gas for data centre boom, at odds with Canada’s clean power aimsCTV News· Jun 9, 2026
- ‘Reflexive and honest’: AI data centre backlash reflects public concerns, analyst saysCTV News· Jun 9, 2026
- Alberta's natural gas pitch for AI data centres clashes with Ottawa's clean power visionMSN· Jun 9, 2026
- Ottawa wants CPP investments in 'sovereign' AI, but some wonder if it's even safeCanada's National Observer· May 25, 2026
- Canada wants sovereign AI data centres. What does that actually mean?CBC· May 14, 2026
- Ottawa spent more than $800M on AI contracts over 3 years, data shows - NationalGlobal News· May 13, 2026
See something wrong or missing on this page? Suggest a correction.