Project Green
New Florence, Montgomery County, MO
Source: Primary source
Project Green is a proposed data center in Montgomery County, MO, operated by NorthPoint Development/Amazon.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Montgomery, Missouri
Project Green in New Florence, MO is contested. Petition: https://www.change.org/p/halt-the-construction-of-server-data-farms-threatening-our-rural-landscape/u/33097052 | Preserve Montgomery County, LLC files law suit Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkFacility size could be 880,000-3,740,000 sq feet Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asNorthPoint Development/Amazon
- This facilityProject Green
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Emergency Town Hall on Potential Falls Township, PA Data Center Canceled Due to Crowd Size ConcernsTAPinto· May 29, 2026
- Assemblyman Singh Holding Emergency Town Hall to Address Potential Falls Twp., PA Data CenterTAPinto· May 26, 2026
- Google’s $15B data center project sparks excitement and concern in small Missouri townKSDK· May 22, 2026
- Lawsuit asks judge to set back Montgomery County data center approval processKOMU 8· Feb 17, 2026
- 1,000-acre AWS data center campus under consideration in Montgomery County, MissouriData Center Dynamics· Jan 15, 2026
- Residents gather again, push back against proposed Montgomery County data centers during town hallABC17NEWS· Dec 8, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Montgomery CO. High in Montgomery City, is 4.7 mi from this site (363 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.