Previder PDC1
Hengelo, Overijssel, Netherlands
Source: Primary source
Previder PDC1 is a mapped data center in Overijssel, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkPrevider B.V. — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Thales en KPN bouwen staatsgeheime militaire cloud voor DefensieRTV Oost· Apr 12, 2026
- Twentse tech slaat terug: zeven bedrijven bouwen aan alternatief voor Amerikaanse cloudreuzenTubantia· Apr 3, 2026
- Hengelo's bedrijf Previder maakt vuist tegen Amerikaanse techreuzen1Twente· Apr 3, 2026
- Space datacenters voorlopig nog sciencefictionComputable.nl· Mar 25, 2026
- AI-toekomst in gevaar: Europa raakt ver achterop in datacenterwedloopsDe Telegraaf· Nov 25, 2025
- Explosie in energieverbruik datacenters: ’Verdubbeling richting 2030’De Telegraaf· Nov 18, 2025