Mapped (unverified)colocation
ITB2 Datacenter Deventer
Deventer, Overijssel, Netherlands
Source: Primary source
ITB2 Datacenter Deventer is a mapped data center in Overijssel, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Overijssel
Overview
source: linkITB-Kwadraat B.V. — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Nieuwe datacenters niet welkom in Overijssel, maar hoeveel zijn er eigenlijk?RTV Oost· Aug 22, 2026
- TenneT blijkt koper van datacenter ITB2 in ApeldoornComputable.nl· Aug 10, 2026
- ITB2 Datacenters gaat na dertig jaar stoppenComputable.nl· Jul 30, 2026
- Ook Inno doet het buitenhuisDe Standaard· Jun 8, 2005
- Netherlands Colocation Data Center Portfolio Analysis Report: EdgeConneX, Digital Realty, and Equinix Dominate the Current Landscape, Ranking As the Top Operators by Both White-floor Area and IT Load - ResearchAndMarkets.comBusiness Wire· Jan 6, 2026
- Over 56,000 households in Deventer and Huizen connected to Ziggo Gigabit internetwww.vodafoneziggo.nl· Aug 2, 2021
See something wrong or missing on this page? Suggest a correction.