InterDC Enschede
Enschede, Overijssel, Netherlands
Source: Primary source
InterDC Enschede is a mapped data center in Overijssel, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkInterRacks — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Apollo Tyres haalt uit naar plan van Enschede voor Vredesteinterrein: ‘High-tech is wensdenken’Tubantia· Jun 9, 2026
- Bedrijven Almere en Dronten mogelijk betrokken bij faciliteren van Russische cyberaanvallenOmroep Flevoland· May 22, 2026
- FIOD houdt twee verdachten aan wegens overtreding sanctiewetgevingFIOD· May 22, 2026
- Twee mannen opgepakt op verdenking van faciliteren Russische cyberaanvallenNOS· May 22, 2026
- Invallen bij panden en datacenters in Dronten en Almere om mogelijke rol bij Russische cyberaanvallende Stentor· May 22, 2026
- FIOD doet inval bij Nederlandse hostingbedrijven die pro-Russische cyberaanvallen faciliteerdende Volkskrant· May 22, 2026