Skip to content
DataCentersExposed
Mapped (unverified)

PLAY Centrum Danych DC 2

Katowice, województwo śląskie, Poland

Source: OpenStreetMap

PLAY Centrum Danych DC 2 is a mapped data center in województwo śląskie, Poland, operated by 3S Data Center S.A.. DataCentersExposed has documented a 14,877 sq ft footprint at this site. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
3S Data Center S.A.
Operator
3S Data Center S.A.
Footprint
14,877 sq ft
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo śląskie
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

PLAY Centrum Danych DC 2 is a mapped data center in Katowice, Poland, operated by 3S Data Center S.A. Available records list a footprint of 14,877 square feet. Ownership above 3S Data Center S.A. is not disclosed in the available facts.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh

A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Poland data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.