Mapped (unverified)colocation
Netia Jaworzno (JAWOH001)
Jaworzno, województwo śląskie, Poland
Source: Primary source
Netia Jaworzno (JAWOH001) is a mapped data center in województwo śląskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo śląskie
Overview
source: linkNetia S.A. — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.