Mapped (unverified)colocation
ATMAN Data Center Katowice-1 (KTW-1, Altus)
Katowice, województwo śląskie, Poland
Source: Primary source
ATMAN Data Center Katowice-1 (KTW-1, Altus) is a mapped data center in województwo śląskie, Poland, operated by ATMAN. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
ATMAN
Operator
ATMAN
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo śląskie
Overview
source: linkAtman Sp. z o.o. — colocation facility (6 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Wielka inwestycja pod Warszawą. Ma tu stanąć 50 tysięcy serwerówNext Gazeta.pl· Sep 22, 2025
- Atman uruchomił pod Warszawą centrum danych WAW-3 za 2,5 mld złMM Magazyn Przemysłowy· Sep 18, 2025
- Pod Warszawą powstaje gigantyczne centrum danych Atman Data Center Warsaw-3Investmap· Dec 20, 2023
- Atman Data Center Warsaw-3 (WAW-3)Investmap· Oct 16, 2023
- Ruszyła budowa wielkiego centrum danych Atman Data Center Warsaw-3Investmap· Oct 16, 2023
- Spółka ATM zmieniła nazwę na AtmanITwiz· Sep 13, 2021
See something wrong or missing on this page? Suggest a correction.