Mapped (unverified)colocation
NetAccess Hamilton HAM02
Hamilton, Ontario, Canada
Source: Primary source
NetAccess Hamilton HAM02 is a mapped data center in Ontario, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkNetAccess Systems Inc — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Hamilton considering temporary AI data centre banMobileSyrup· Jun 18, 2026
- M.P. Danko says Hamilton could miss the boat on $890 million for Data Centrebayobserver.ca· Jun 18, 2026
- Developer withdraws plans to build northern Ontario AI data centre over public oppositionCBC· Jun 18, 2026
- Hamilton pushes ahead with data-centre moratorium as AI power demand explodesMSN· Jun 17, 2026
- Hamilton advances proposed data centre moratorium in pushback to rapid AI buildoutGlobal News· Jun 17, 2026
- Hamilton councillors OK step toward moratorium on AI data centresCBC· Jun 16, 2026
See something wrong or missing on this page? Suggest a correction.