Mapped (unverified)colocation
Namex Bari Datacenter
Bari, Puglia, Italy
Source: Primary source
Namex Bari Datacenter is a mapped data center in Puglia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Puglia
Overview
source: linkNamex - Rome Internet eXchange Point — colocation facility (28 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Data center, il Sud hub digitale proiettato verso il MediterraneoIl Mattino· Aug 24, 2026
- La rivolta delle comunità | data center la nuova battaglia politica dell’America profondaZazoom Social News· Aug 14, 2026
- L’Italia invasa dai data centerGuerre di Rete· Jul 30, 2026
- **Poste: progetto data center 70 mw proposto a Tim, Intesa Sp e Coima**Quotidiano di Bari· Jul 24, 2026
- Data center: le rinnovabili bastano, il nucleare non serve. Ecco lo studioIl Fatto Quotidiano· Jul 16, 2026
- Data center. Dopo le proteste in Lombardia, a caccia di terreni in PugliaKey4biz· Jul 15, 2026