Mapped (unverified)colocation
Hex - DC/Bds
Brindisi, Puglia, Italy
Source: Primary source
Hex - DC/Bds is a mapped data center in Puglia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Puglia
Overview
source: linkGAMGROUP SRLS — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- PSOE-M etichetta come un brindisi al sole la comparsa del consigliere e richiede il fascicolo dell'attico di ChamberíDemócrata· Aug 26, 2026
- HLPF: il modello Lombardia su sviluppo sostenibile protagonista a New Yorkonuitalia.com· Jul 16, 2026
- Data center. Dopo le proteste in Lombardia, a caccia di terreni in PugliaKey4biz· Jul 15, 2026
- Il business data center in Puglia, corsa dei big dopo l’alt in Lombardia: 19 richieste nel Baresela Repubblica· Jul 15, 2026
- Una valle di server. Il grande affare dei data center in PugliaFondazione Giangiacomo Feltrinelli· Jul 10, 2026
- Viaggio nei data center italiani: quali sono, dove sono e di chi sonoIl Bo Live· May 4, 2026
See something wrong or missing on this page? Suggest a correction.