Mapped (unverified)colocation
Binap Bn01 Data Center
BARI, Puglia, Italy
Source: Primary source
Binap Bn01 Data Center is a mapped data center in Puglia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Puglia
Overview
source: linkDODONET SRL — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Data center, il Sud hub digitale proiettato verso il MediterraneoIl Mattino· Aug 24, 2026
- La rivolta delle comunità | data center la nuova battaglia politica dell’America profondaZazoom Social News· Aug 14, 2026
- L’Italia invasa dai data centerGuerre di Rete· Jul 30, 2026
- **Poste: progetto data center 70 mw proposto a Tim, Intesa Sp e Coima**Quotidiano di Bari· Jul 24, 2026
- Data center. Dopo le proteste in Lombardia, a caccia di terreni in PugliaKey4biz· Jul 15, 2026
- Il business data center in Puglia, corsa dei big dopo l’alt in Lombardia: 19 richieste nel Baresela Repubblica· Jul 15, 2026
See something wrong or missing on this page? Suggest a correction.