Microsoft TRP1

Bexar County, TX

Source: OpenStreetMap

Microsoft TRP1 is a mapped data center in Bexar County, TX, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented a 177,468 sq ft footprint at this site.

Reporting by · Updated Aug 23, 2026

Real parent
Microsoft Corporation
Operator
Microsoft Data Center LLC
Est. capacity
~35-75 MW
Footprint
177,468 sq ft
Interconnection
~75 MW
Utility
Bandera Electric Coop, INC
Grid
ERCO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Microsoft data center

Operator chain

The grid behind this site, right now

source: ERCOT · gridstatus
Clean right now
47%
Fossil right now
53%
Grid operator
ERCOT
  • Natural Gas43.2%
  • Solar37.3%
  • Coal9.7%
  • Nuclear5.6%
  • Wind4.1%

Real-time generation mix for the ERCOT grid this site draws from, as of Aug 17, 2026, 8:04 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.1 mi
Texas Research · 138 kV
Transmission line
0.6 mi
138 kV line
Municipal water
Served
Saws Texas Research Park

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2023 · term yr · source
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2015 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2013 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2013 · term yr · source
Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Medina Valley Loma Alta Middle in San Antonio, is 1.2 mi from this site (790 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.