Microsoft Datacenter is a mapped data center in Noord-Holland, Netherlands, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented a 1,550,411 sq ft footprint at this site. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Aug 28, 2026
Overview
source: linkMicrosoft Datacenter is a mapped data center site in NL-NH, Netherlands, run by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. The site covers a footprint of 1,550,411 square feet. Beyond that footprint and the corporate-parent link, little else has been verified about the facility.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Data Center LLC
- This facilityMicrosoft Datacenter
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Weer protest tegen datacenter, maar 'we weten allemaal dat we ze nodig hebben'NOS· Aug 17, 2026
- Microsoft koopt perceel aan op Agriport voor 44 miljoen euro, maar blijft voor nieuw datacenter afhankelijk van energie. ’Sluiten achteraan in de wachtrij’Noordhollands Dagblad· Jul 22, 2026
- Microsoft blijft ondanks protest miljarden pompen in datacenters op Nederlandse bodem: ’Veel weerstand komt voort uit onwetendheid’De Telegraaf· Jul 21, 2026
- XR beschadigt fundering nieuw Microsoft datacenter in AmsterdamDutch IT Channel· Jul 17, 2026
- Extinction Rebellion saboteert bouwplaats datacenter voor Microsoft in AmsterdamNRC - Nieuws, achtergronden en onderzoeksjournalistiek· Jul 16, 2026
- Eén datacenter van Microsoft slurpt evenveel stroom als heel Eindhoven. Hoe kan dat op het toch al volle Nederlandse stroomnet?NRC - Nieuws, achtergronden en onderzoeksjournalistiek· Jul 16, 2026