Mapped (unverified)
Mcデジタル・リアルティ Nrt12
Chiba, Japan
Source: OpenStreetMap
Mcデジタル・リアルティ Nrt12 is a mapped data center in Chiba, Japan, operated by MCデジタル・リアルティ. DataCentersExposed has documented a 53,818 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Oct 13, 2026
Real parent
MCデジタル・リアルティ
Operator
MCデジタル・リアルティ
Est. capacity
~10-25 MW
Footprint
53,818 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Chiba
Overview
source: linkNRT12 is a data center in Japan operated by MCデジタル・リアルティ. Available records map the site with a reported footprint of 53,818 square feet. The ownership chain above MCデジタル・リアルティ is not disclosed in available records.
Operator chain
- Ultimate parentMCデジタル・リアルティ
- Files asMCデジタル・リアルティ
- This facilityMcデジタル・リアルティ Nrt12
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- なぜ大阪・彩都に巨大データセンターが集まり続けるのか?「KIX15」着工が示す大阪の競争力再都市化· Oct 11, 2026
- MCDRが関西で24MWのDC着工 KIX15でAI基盤を拡充PlusWeb3· Oct 9, 2026
- 三菱商事系、茨木に大型データセンター 生成AIの利用拡大に対応 2028年開業へ週刊大阪日日新聞· Oct 8, 2026
- MCDR、AI需要拡大に対応する24MW規模のデータセンター「KIX15」を着工クラウド Watch· Oct 7, 2026
- MCデジタル・リアルティ24MWの大規模データセンター「KIX15」着工PR TIMES· Oct 7, 2026
- 三菱商事系が大阪にデータセンター、国内10棟目 AI向け液冷に対応日本経済新聞· Oct 6, 2026