IIJ Shiroi DCC
Shiroi-shi, Chiba, Japan
Source: Primary source
IIJ Shiroi DCC is a mapped data center in Chiba, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Chiba
Overview
source: linkInternet Initiative Japan Inc. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 白井市のデータセンター建設問題 住民らが市を提訴 市は請求棄却を求める考え(20260227放送) Jeff Petry (GuOP2NVrBB)Mshale· Aug 10, 2026
- 「DC銀座」で産官学民の会発足 千葉、乱開発の抑制も期待 [千葉県]朝日新聞· Jul 21, 2026
- NTTデータら、千葉に18万㎡超のデータセンター 9月に造成着手建設通信新聞Digital· Apr 23, 2026
- NTTグループ、千葉県白井市と地域活性化で包括連携協定 データセンター開発も住宅新報· Apr 21, 2026
- NTTデータ、国内最大級250MWデータセンター始動 AI時代のインフラ競争が加速PlusWeb3· Apr 21, 2026
- NTTデータグループ、千葉県印西・白井エリアに約200MWの「東京TKY12データセンター」開発を始動クラウド Watch· Apr 20, 2026