Mapped (unverified)
Mcデジタル・リアルティ Nrt10
Chiba, Japan
Source: OpenStreetMap
Mcデジタル・リアルティ Nrt10 is a mapped data center in Chiba, Japan, operated by MCデジタル・リアルティ. DataCentersExposed has documented a 87,046 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
MCデジタル・リアルティ
Operator
MCデジタル・リアルティ
Est. capacity
~15-35 MW
Footprint
87,046 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Chiba
Overview
source: linkMCデジタル・リアルティ NRT10 is a mapped data center in Japan operated by MCデジタル・リアルティ. Available records put its footprint at 87,046 square feet. The ultimate parent above MCデジタル・リアルティ is not disclosed in the facts on file.
Operator chain
- Ultimate parentMCデジタル・リアルティ
- Files asMCデジタル・リアルティ
- This facilityMcデジタル・リアルティ Nrt10
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- なぜ大阪・彩都に巨大データセンターが集まり続けるのか?「KIX15」着工が示す大阪の競争力再都市化· Oct 11, 2026
- 三菱商事系、茨木に大型データセンター 生成AIの利用拡大に対応 2028年開業へ (週刊大阪日日新聞)Yahoo!ニュース· Oct 9, 2026
- MCDRが関西で24MWのDC着工 KIX15でAI基盤を拡充PlusWeb3· Oct 9, 2026
- 大阪・茨木でデータセンターを着工 MCデジタル・リアルティestie· Oct 8, 2026
- 三菱商事系、茨木に大型データセンター 生成AIの利用拡大に対応 2028年開業へ週刊大阪日日新聞· Oct 8, 2026
- MCDR、AI需要拡大に対応する24MW規模のデータセンター「KIX15」を着工クラウド Watch· Oct 7, 2026
See something wrong or missing on this page? Suggest a correction.