Lake Hawkeye Data Center
Lansing, Tompkins County County, NY
Source: Primary source
Lake Hawkeye Data Center is a proposed data center in Tompkins County County, NY, operated by TeraWulf Inc.. DataCentersExposed has documented 150 MW of reported power capacity and a 1,360,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Tompkins, New York
Lake Hawkeye Data Center in Lansing, NY is contested. Organized Advocacy | Petition: https://actionnetwork.org/petitions/reject-the-development-of-an-ai-data-center-on-cayuga-lake | Group: https://www.nodatacenterflx.com/ Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
150 MW of new demand — roughly a city of 120,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in NY is 29.4¢/kWh, up 14.6% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkData center and battery storage, former coal power plant. Up to 1 million plus sq feet. Phase 1 is western 3 buildings, followed by Phase 2, a single larger building east of those 3. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asTeraWulf Inc.
- This facilityLake Hawkeye Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- TeraWulf falls 7% after New York orders one-year pause on new data center permits - The BlockThe Block· Jul 15, 2026
- Gov. Hochul signed a data center moratorium. It’s unclear if it will halt TeraWulf’s plans in Lansing. - The Ithaca VoiceThe Ithaca Voice· Jul 14, 2026
- TeraWulf-Anthropic Deal Paves Way for Kentucky Data Center Construction - Industrial Info ResourcesIndustrial Info Resources· Jul 8, 2026
- Anthropic signs $19bn, 20-year lease for Kentucky data center with TeraWulf - Data Center DynamicsData Center Dynamics· Jul 6, 2026
- Cayuga Lake Residents Deliver Petition Against Proposed TeraWulf Data Center - Ithaca TimesIthaca Times· Jun 25, 2026
- No Data Center FLX petition gains momentum, continues calls to action against proposed TeraWulf data center - 607 News Now607 News Now· Jun 22, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Trumansburg Elementary School in Trumansburg, is 4.6 mi from this site (389 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.